FAKTOR-FAKTOR KRITIS KESUKSESAN PROYEK TERHADAP KINERJA PROYEK DI PT WIJAYA KARYA (PERSERO) TBK

  • Sutikno Sutikno PT Wijaya Karya
Keywords: project management office, project management system

Abstract

Research objective is find of influences number from construction project performace critical success factor: project management office variable, project management system, site condition, owner involvment, and project management team capacity. Project performance especially be measured by cost, quality and time parameter, wthout rule out anothers parameter. Research method use questionare survey. Total question answer is 250 respondens from 630 related population number. Data analysis use Structural Equation Modelling (SEM) and theresult shows that project management office variable, project management system, site condition, owner involvment, and project management team capacity, have positif influence to project performance at PT. Wijaya Karya (Persero) Tbk. Hypothesys all accept with significant indicators: (<) α = 0,05 and alsoT-calculate, T calculate (>) T table. The most dominant variable  is project management team capacityvariable take effect to project performace with CR number = 6.365. Indirect influences also analysed used Sobel test and the result shows that project management office variable, project management system, site condition and owner involvment, have positif influence to project management team capacity.The smallest number of Sobel test is2,370, it means ≥ 1,96.

Keywords: project management office, project management system, site condition, owner involvment, project management team capacity and project performance.

Published
2017-10-31
How to Cite
Sutikno, S. (2017, October 31). FAKTOR-FAKTOR KRITIS KESUKSESAN PROYEK TERHADAP KINERJA PROYEK DI PT WIJAYA KARYA (PERSERO) TBK. Jurnal Pendidikan Ekonomi & Bisnis, 5(2), 195-205. https://doi.org/https://doi.org/10.21009/JPEB.005.2.7