[1]
Basori et al. 2016. ANALISIS UNJUK KERJA TURBIN AIR PADA PUSAT LISTRIK TENAGA AIR (PLTA) DENGAN KAPASITAS 70 MW. Jurnal Konversi Energi dan Manufaktur. 3, 3 (Oct. 2016), 131–134. DOI:https://doi.org/10.21009/JKEM.3.3.3.