Setiawan, Dibyo, Tubagus Syah Fatahillah Gelagah Wangi Bintaran, Apri Setiawan, Hanni Maksum Ardi, Herbert Hasudungan Siahaan, and Cahyo Wibowo. 2026. “Analysis of Lead Time Reduction in Pre-Delivery Installation Process of Excavator Units at PT. XYZ Assembly Plant”. Jurnal Konversi Energi Dan Manufaktur 11 (1):37 – 52. https://doi.org/10.21009/JKEM.11.1.5.