[1]
Khiyana, A. et al. 2025. ANALYSIS AND RISKS FAST TRACK AND CRASH PROGRAM METHOD ON BUILDING PROJECT. Jurnal Pensil : Pendidikan Teknik Sipil. 14, 1 (Jan. 2025), 154 - 168. DOI:https://doi.org/10.21009/jpensil.v14i1.50234.