[1]
Susanti, D.D. et al. 2025. COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD. Jurnal Pensil : Pendidikan Teknik Sipil. 14, 2 (May 2025), 316–330. DOI:https://doi.org/10.21009/jpensil.v14i2.54314.