(1)
Darmawan, R.; Susetyo, B. IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD. jpensil 2025, 14, 1-19.