Rejeki, M. V. (2022). TIME DELAY ANALYSIS ON THE AYSHA CIBINONG ISLAMIC HOSPITAL PROJECT. Jurnal Pensil : Pendidikan Teknik Sipil, 11(2), 131–141. https://doi.org/10.21009/jpensil.v11i2.25288