Yeremia, M., & Irfanto, R. (2025). IDENTIFICATION OF PRODUCTIVITY VALUES USING THE METHOD PRODUCTIVITY DELAY MODEL ON WALLER BEAM WORK. Jurnal Pensil : Pendidikan Teknik Sipil, 14(2), 343–355. https://doi.org/10.21009/jpensil.v14i2.53988