Rolobessy, A. R. P., Djakfar, L., & Negara, K. P. (2025). ASSESSMENT OF SCHEDULE UNCERTAINTY AND RISK MITIGATION IN ACCELERATED BRIDGE CONSTRUCTION USING PERT. Jurnal Pensil : Pendidikan Teknik Sipil, 14(3), 440–455. https://doi.org/10.21009/jpensil.v14i3.59011