IMPLEMENTASI KOMPONEN SISTEM FASILITAS TRANSPORTASI TERHADAP BATAS SRP DAN WAKTU TUNGGU LAYANAN KEBERANGKATAN DAN KE.docxIMPLEMENTASI KOMPONEN SISTEM FASILITAS TRANSPORTASI TERHADAP BATAS SRP DAN WAKTU TUNGGU LAYANAN KEBERANGKATAN DAN KE.docx
DOI:
https://doi.org/10.21009/logistik.v11i2.17682Keywords:
implementation, components, transportation facility system, srp, service timeAbstract
One of the functions of a public transport terminal that has a function as a temporary stopover from road transport activities. Likewise with the function of the Pulo Gebang Integrated Terminal which has a function as a point transit and a temporary stop from road transportation activities for the AKAP Bus and the AKDP Bus. In carrying out its function as a terminal, safe, smooth and comfortable circulation is required. Start the bus in the position in front of the terminal door, or when the bus is in a position outside the terminal door. The smooth circulation of the terminal will have an impact on parking capacity and service waiting times, which in turn will result in the smooth departure and arrival of buses at the Pulo Gebang Integrated Terminal.
In order to expedite the circulation of the activities of the arrival and departure of the AKAP Bus at the Pulo Gebang Integrated Terminal, needed problem solving is regarding the implementation of the SOP. AKAP Bus departures and arrivals. By the authors conducted research by collecting various kinds of research data while carrying out the Job Training (PKL) there. The data collection process was carried out by using various methods, such as: field observation techniques, interview techniques, and requests for permission to request data on the daily reports of AKAP Bus departures and arrivals. Then, the collected data is reviewed and it is hoped that it can become a solution for the performance in the Operational Unit and the Integrated Terminal Partnership Pulo Gebang in carrying out operational activities for the departure and arrival of the AKAP Bus.
The results of this study found obstacles that occurred during the implementation process of the facility system component activities against the limit SRP and bus operational service time at the Pulo Gebang Integrated Terminal. This is supported by the daily data on the arrival and departure of the AKAP Bus at the Pulo Gebang Integrated Terminal.
Downloads
Published
Issue
Section
License
Authors who publish with this Journal agree to the following terms:
- Author retain copyright and grant the journal right of first publication with the work simultaneously licensed under a creative commons attribution licensethat allow others to share the work within an acknowledgement of the work’s authorship and initial publication of this journal.
- Authors are able to enter into separate, additional contractual arrangementfor the non-exclusive distribution of the journal’s published version of the work (e.g. acknowledgement of its initial publication in this journal).
- Authors are permitted and encouraged to post their work online(e.g. in institutional repositories or on their websites) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published works.
-
Users/public use of this website will be licensed to CC BY-NC-SA Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License