PERANCANGAN TATA LETAK LAPANGAN PENUMPUKAN PETI KEMAS (STUDI KASUS PELABUHAN SORONG)

  • Gita Kurnia Universitas Pertamina
  • Adi Kurnia Prasetiyono Universitas Pertamina
  • Andika Mochamad Refiawan Universitas Pertamina
  • Marlene Hibatullah Universitas Pertamina
  • Ferani Eva Zulvia Universitas Pertamina
Keywords: facility layout, port operations, container terminal, container handling, yard occupancy ratio

Abstract

Port of Sorong plays an important role in the export-import container activities especially for West Papua Province. Based on initial observation, the current operations in the container terminal of Sorong Port have not run efficiently due to inefficient layout of its container yard. Therefore, this study aims to propose a new container yard layout for Sorong Port. The proposed layout is designed based on future demands and relations among container activities in the terminal. This study applies forecasting methods to forecast the future numbers of inbound and outbound containers handled at Sorong Port and to determine the capacity requirement of the container yard. The performance of the proposed layout is evaluated based on the Yard Occupancy Ratio (YOR). As result, the proposed layout will be able to accommodate Sorong Port’s demand with good performance of YOR value of 71,03% in 2025.

Published
2021-10-24
Section
Articles