ANALISA PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN MEKANIKAL DAN ELEKTRIKAL (STUDI KASUS REVITALISASI GEDUNG KANTOR CABANG BNI KELAPA GADING, JAKARTA)

  • Yudha Gusty Wibowo Universitas Negeri Jakarta
  • Adhi Purnomo Universitas Negeri Jakarta
  • Lenggogeni Universitas Negeri Jakarta
Keywords: productivity, labour, labour utilization rate, mechanical, electrical

Abstract

In construction world, the labour’s productivity is one of the determining factors for development project. There are many tools to measure the productivity levels. One of which is by examining LUR (Labour Utilitation Rate) for each worker, that is to explore the labour’s effectivity in running their work. The purpose of this research is for knowing the labour’s productivity rate. This research was conducted on revitalization of BNI branch office at Kelapa Gading, Jakarta. by observing the labours in mechanical and electrical work. LUR observation are carried out based on daily reports of completed mechanical and electrical work.

References

Aprilian, T. (2010). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Struktur Rangka Atap Baja (Studi Kasus Proyek Pembangunan Rumah Sakit Dr. Moewardi, Surakarta, Jawa Tengah). Surakarta: Universitas Sebelas Maret

Dewi, A. . D. P., Sudipta, I. G. K., & Setyowati, D. S. (2016). Analisis Aspek Sumber Daya Manusia Terhadap Kinerja pada Proyek Konstruksi Di Kabupaten Bandung. Jurnal Ilmiah Teknik Sipil, 20(2), 103–109.

Hasibuan, M. S. P. (2017). Manajemen Sumber Daya Manusia (21st ed.). PT. Bumi Aksara.

Hutasoit, J. P., & Sibi, et al. (2017). Analisis Produktivitas Tenaga Kerja Konstruksi Pada Pekerjaan Pasangan Lantai Keramik Dan Plesteran Dinding Menggunakan Metode Work Sampling. Jurnal Sipil Statik, 5(4), 205–214.

Maharani, N. (2019). Tingkat dan Faktor yang Memengaruhi Produktivitas Tenaga Kerja Pada Pekerjaan Struktur, Studi Kasus : Proyek Pembangunan Gedung Kost Dua Lantai di Sapen, Gondokusuman, Demangan No.639 [Universitas Islam Indonesia]. https://dspace.uii.ac.id/handle/123456789/17700pdf

Mandani, T. (2010). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan Bata (Studi Kasus Proyek Pembangunan Rumah Sakit Dr. Moewardi, Surakarta, Jawa Tengah). Surakarta: Universitas Sebelas Maret.

Oglesby, D. (1989). Productivity Improvement in Construction. New York: McGraw-Hill Book Company.

Pangemanan, D. D., & Kondoj, N. E. (2019). Pengukuran Produktivitas Tukang pada Pekerjaan Pasangan Dinding Bata. Jurnal Teknik Sipil Terapan, 1(2), 33-44.

Purnama, R. (2008). Pengaruh Motivasi Kerja Terhadap Produktivitas Kerja Karyawan pada Bagian Produksi CV. Epsilon Bandung. Jurnal Strategic, 7(14).

Tisnawan, R., & Hadi, S. (2016). Analisa Produktivitas Tenaga Kerja dan Biaya Pada Pekerjaan Pasangan Rangka Atap Pada Pembangunan Perumahan Panam View Tipe 48. Racic: Rab Construction Research, 1(02), 96-105.

Published
2021-06-30