ANALISIS MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN GEDUNG LABORATORIUM TERPADU DAN PERPUSTAKAAN MAN 1 MALUKU TENGAH

  • Sinta Nuria Wally Politeknik Negeri Ambon, Jl. Ir. M. Putuhena, Rumah Tiga, Kec. Tlk. Ambon, Kota Ambon, Maluku
  • Octovianus Jamlaay Politeknik Negeri Medan, Jl. Ir. M. Putuhena, Rumah Tiga, Kec. Tlk. Ambon, Kota Ambon, Maluku
  • Meyke Marantika Politeknik Negeri Medan, Jl. Ir. M. Putuhena, Rumah Tiga, Kec. Tlk. Ambon, Kota Ambon, Maluku
Keywords: risk management, risk matrix, work accident

Abstract

This study aims to determine the risks that occur in the Construction Project of the Integrated Laboratory Building and Man 1 Library, Central Maluku. The method used is a qualitative analysis method. The subjects in this study were workers in the Integrated Laboratory Building Development Project and the Man 1 Library in Central Maluku totaling 30 samples. The primary data collection techniques are through questionnaires and secondary data collection is through work items while the data analysis methods used are Validity Test, Reality Test, and data analysis with a risk matrix.

References

Cahyadi,E.R. (2001). A Guide to the Project Managemen Of Body Knowledge (PMBOK Guide). USA

Alfatiyah, R. (2017). Analisis manajemen risiko keselamatan dan kesehatan kerja dengan menggunakan metode HIRARC pada pekerjaan seksi casting. Jurnal Mesin Teknologi (SINTEK Jurnal), 88-10 . Retrieved Agustus 15, 2018 from http://jurnal,umj.ac.id/indeks.php/sintek/article/download/2100/1776

Anizar. (2012). Teknik Kesehatan dan Keselamatan Kerja di Industri, Yogyakarta : Graha Ilmu.

AS/NZS. (2004). Risk Management Guidelines Companion to AS/NZS 4360:2004.

Asfahl, C,R. (1999). Industri Safety and Healt Managemet; Prentice Hall, New Jersey

Darmawi, H. (2014). Manajemen Perbankan. Jakarta : PT, Bumi Aksara

Ervianto,I.W. (2005). Manajemen Proyek Konstruksi Edisi Revisi. Yogyakarta.

Ervianto, W.I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi. Penerbit : Andi, Yogyakarta

Ghozali, Imam. (2011). “Aplikasi Analisi Multivariate Dengan Program SPSS”Semarang : Badan Penerbit Universitas Diponogoro

HB 436. (2004). Standart Australia International, Sydney. Retrieved from Standars New Zealand Database.

Husen, A. (2010). Manajemen proyek. Yogyakarta : Penerbit ANDI

Imam Soeharto. (2001). Manajemen Proyek dan Konstruksi, Penerbit Kanisius,

Kerzner. (2006). Panduan Aplikasi Proyek Konstruksi, Yudhistira, Jakarta.

Labombang, Mastura. (2011). Manajemen Resiko dalam proyek Konstruksi. Jurnal SMARTek. Vol. 9 No. 1. Universitas Tadaluko. Palu

Soehatman Ramli. (2010). Pedoman Praktis MANAJEMEN RESIKO dalam Perspektif K3 OHS Risk Management. Jakarta : PT. Dian Rakyat.

Sugiyono. (2015), Metode Penelitian kombinasi (Mix Methods). Bandung : Alfabeta

Sugiyono. (2007). Metode Penelitian Kuantitatif Kualitatif dan R&D. Bandung : Alfabeta

Sugiyono. (2017). Metode Penelitian Kuantitatif, Kualitatif, Dan R&D . Bandung : Alfabeta, CV.

Tarwaka. (2008). Keselamatan dan Kesehatan Kerja Manajemen dan Implementasi K3 di Tempat Kerja, Harapan Press,Surakarta

Wijanarko E. (2017). Analisis Risiko Keselamatan Pengunjung Terminal Purabaya Menggunakan Metode Hirarc (Hazard Identification Risk Asessement And Risk Control). Tugas Jurusan Teknik Industri Fakultas Teknologi Institut Teknologi Sepuluh Nopember Surabaya.

Published
2022-07-09