ANALISIS PEMAKAIAN BETON PRECAST , READY MIX DAN BETON OLAH PADA PROYEK PEMBANGUNAN JALAN TOL

  • Johanson Pardede Universitas Tamajagakarsa
  • Mardiaman Universitas Tamajagakarsa

Abstract

This study aims to determine the method and its effect on the application of the use of ready-mixed concrete, processed concrete and precast concrete in the Cimanggis-Cibitung toll road construction project. Concrete is a structurally strong building material and is widely used in the construction of buildings, roads and dams. Precast concrete is a concrete product for construction that is specially produced with a predetermined size. This material is made from various mixtures of aggregates and cement binders. The method used is the AHP method. The resulting concrete consists of cement, sand, split which is processed with a special formulation carried out by the Batching Plant, to become cast concrete that is ready to use. Quality concrete is ready to be served in the Cimanggis-Cibitung toll road project area Section 1 A or as a material for making precast concrete. The expert opinion of the SKA Muda owner regarding the calculation of suitable concrete for the Cimanggis-Cibitung toll road work is as follows: Precast Concrete (C01), first place with a total value of 0.691, Ready-to-use Concrete (C02), second place with a total value of 0.249 and Processed Concrete (C03), ranked third with a total score of 0.060.

References

Adiasa, A. M., Prakosa, D. K., Dwihatmoko, J. U., & Santoso, T. D. (2015). Evaluasi Penggunaan Beton Precast di Proyek Konstruksi. JURNAL KARYA TEKNIK SIPIL, Volume 4, Nomor 1, , 126 - 134.

Akbar, S. A., Satria, A., Kustaman, & Wulandari, L. K. (2020). Analisis Perbandingan Biaya dan Waktu Saluran Drainase Batu kali dan Beton Readymix dan Beton Pracetak Pada Ruas Jalan Boyolanggu -Campurdarat Kabuopaten Tulunggagung. Journal Itm , 1-12.

Apriyanto, A. (2008). Perbandingan Kelayakan Jalan Beton dan Aspal Studi Kasus jalan Raya Demak - Godong. Semarang: Program Pasca Sarjana Universitas Diponegoro.

Dachlan, T. (2009). Kajian Lapangan Perkerasan Jalan Beton Di Indonesia. Journal Jaolan dan Jembatan PU, 1 - 15.

Feny Aries Tanti*1, G. W. (2020). Sistim Pendukung Prioritas Lokasi Perbaikan Jalan Mengunakan Metode Analysis Hierarki Process dan simple Additive Weigting Studi Kasus Kabupaten Pasuruan . REPOSITOR, Vol. 2, No. 9, September 2020, Pp. 1249-1256 , 1249 - 1256.

Fitriati1, U. (2006, Desember). Studi Perbandingan Beton Ready-Mix Dengan Beton Olah Di Tempat Pada Proyek Pembangunan Ruko Di Kota Banjarbaru. INFO TEKNIK, 7(7), 11.

Frederika, A., Wiranata, A., & Larasati , K. L. (2014). Perbandingan Biaya dan Waktu Pelaksanaan Pekerjaan Balok Struktur Beton Gedung Antara Metode Konvensional dengan Precast. Jurnal Ilmiah Teknik Sipil Vol. 18, No. 2, 129.

Gautama, G. (2017). Efektifitas Penggunaan Rigid Pavement Pada Ruas Jalan Tol Bakauheni-Terbanggi Besar Provinsi Lampung. TAPAK Vol. 6 No. 2, 175.

Khonado, M. F., Manalip, H., & Wallah, S. E. (2019). Kuat Tekan dan Permeabilitas Beton Porous Dengan Variasi Ukuran Agregat. Jurnal Sipil Statik Vol.7 No.3, 351 -358.

Md, M. L. (2018). Sistem Pendukung Keputusan Penerimaan Operator Alat Berat Pada Pt. Putra Sumber Batam Dengan Metode Analytical Hierarchy Process (. Batam.

Muhammad, S., Zalnicha, L., & Hadisaputro, I. (2020). Pemakaian Beton Pracetak Alternatif Pada Perencanaan Gedung RSUD Type B. EQUILIB, Vol. 01, No. 01, Maret 2020, 1-10.

Rahmi, F. (2021). Identifikasi Waste Pada Beton Ready Mix. Palembang , Sumatra Selatan: Tehnik Sipil Universitas Sriwijaya.

Risdiyanti, A., & Siswoyo. (2018). Analisa Perbandingan Biaya dan Waktu Anara Metode Konvensional dan Pracetak . axial, Jurnal Rekayasa dan Manajemen Konstruksi Vol. 6, No.2, , 69 - 78.

Riyanto, H. (2010). Perilaku Statis Struktur Beton Pracetak Dengan Sistim Sambungan Basah. Jurnal Teknik Sipil UBL Volume 1 No. 1 , 11.

Sedyanto, & Alkik, M. H. (2018). Analisis Perbandingan Waktu dan Biaya pada Pelaksanaan Pekerjaan Kolom Precast dan Konvensional. Jurnal Ilmu Teknik dan Komputer Vol. 2 No. 1 Januari 2018, 28 -35.

Simanjuntak, M. R., & Harkhoni, A. (2019). Identifikasi Faktor & Variabel Produktifitas Beton Precast ( studi Kasus Jalan Tol Becakayu. TECHNOPEX-2019 Institut Teknologi Indonesia, 140 - 144.

Soetjipto, J. W. (2014). Analisa Perbandingan Pelaksanaan Pembangunan Menggunakan Beton Konvensional dengan Elemen Beton Pracetak pada Bangunan Tingkat Tinggi. Journal Precast 02, 1 - 15.

Subagyo, s., Nurohman, & Wijaya, D. N. (2021). Pengendalian Pekerjaan Perkerasan Kaku ( Rigid Pavement) Pada Proyek Pembangunan Jalan Tol Interchange Bandara Adi Sumarmo Solo. Civetech vol 3 no 2, 81.

Sukarmei, D. (2011). Pengaruh Metode Evaluasi Penawaran Pengadaan Barang/Jasa Pemerintah Terhadap Hasil Pekerjaan Dengan Pendekatan Analytical Hierarchy Process . Semarang: Universitas Diponegoro.

Tjictrosoma, T. R., & Subakti, A. (2012). Perancangan Modifikasi Struktur Gedung RSUD Dr Kanujoso Djatiwibowo Menggunakan Beton Pracetak dan Metode Pelaksanaan. JURNAL TEKNIK POMITS Vol. 1, No. 1, (2012) 1-5 , 1 - 5.

Published
2023-01-24