TINJAUAN PERHITUNGAN RAB PEMBANGUNAN GEDUNG BERDASARKAN PERMEN PUPR NO. 1 TAHUN 2022 (Pada Pembangunan Ruang Kelas Baru Madrasa Tsanawiya Negeri 6 Maluku Tengah)
DOI:
https://doi.org/10.21009/jmenara.v19i1.39388Keywords:
Analisa Harga Satuan Pekerjaan, Permen PUPR No. 1 Tahun 2022, Rencana Anggara BiayaAbstract
ABSTRACT
Cost budget plan is a careful cost budget planning needed in the implementation of the construction of a project that contains budget details in the form of workers' wages, material costs and tools to be used. The Ministry of Public Works issued an Analysis of the Unit Price of Work in 2016 and updated with the Analysis of the Unit Price of Work 2022 issued on January 5, 2022 through Public Works and Public Housing Regulation number 1 of 2022. In the new classroom construction project, MTS N 6 Central Maluku uses the calculation of the project cost budget according to Unit Price Analysis of Work Minister of Public Works and Public Housing number 28/PRT/2016, this is because planning was carried out before the issuance of Unit Price Analysis of Work 2022. With the Unit Price Analysis of Work update in 2022, the author will use Public Works and Public Housing Regulation number 1 of 2022 as a basis for review to analyze the Cost Budget Plan for the MTS N 6 Central Maluku project.
Keywords: Cost Budget Plan, Unit Price Analysis of Work, Public Works and Public Housing Regulation number 1 of 2022
References
Anderson, F. (2018). Perbandingan Perkiraan Biaya Antara Metode SNI Dengan Metode AHSP Pada Pekerjaan Drainase Perumahan Sirih Nasfah Indah. Prosiding Seminar Nasional Multidisiplin Ilmu Universitas Asahan.
Fitrianto, R., & Sumarningsih, D. T. (2019). Penjadwalan Proyek Konstruksi Dengan Metode Penjadwalan PDM (Precedence Diagram Method) dan Perhitungan Waktu dengan PERT (Program Evaluation and Review Technique) (Studi Kasus : Proyek Pembangunan Gedung TK Sultan Agung-UII Tahap II, Nglanjaran, Sleman). DSpace Repository.
Guarango, P. M. (2022). Pengaruh Kompensasi, Motivasi, Stres Kerja Dan Lingkungan Kerja Terhadap Kinerja Karyawan Grosir Sembako CV Jembatan Hitam (Studi Pada Karyawan Grosir Sembako CV. Jembatan Hitam, Ganjar Asri, Kota Metro). Jurnal Manajemen Diversifikasi, 2(3), 706–713.
Kementrian Pekerjaan Umum. (2022). Bagian IV: Analisa Harga Satuan Pekerjaan (AHSP) Bidang Cipta Karya dan Perumahan.
Mardianti, I. Y. (2022). Analisis Daya Dukung Pondasi Tiang Pancang Berdasarkan Data Sondir (Studi Kasus: Pembangunan Gedung Rumah Sakit Pendidikan Universitas Jambi). Menara: Jurnal Teknik Sipil, 17(2), 51–60.
Nugraha, G. Y., Lendra, L., Puspasari, V. H., Widi, T., & Cahyanti, T. W. A. (2023). Analisis Perbandingan RAB Bangunan Gedung Dengan Ahsp 2016 Dan Ahsp 2022. Musamus Journal of Civil Engineering, 5(2).
Nurcahyani, D., Sari, S. N., & Hermawan, A. (2023). Analisis Perbandingan Biaya Pembangunan Rumah Konvensional 1 Lantai Tipe 40 Menggunakan AHSP 2016 dan AHSP 2022 (Studi Kasus: Rumah Di Triharjo, Kabupaten Sleman). Jurnal Ilmiah Teknik Unida, 4(1), 191–202.
Pamungkas, M. D. (2023). Perbandingan Perhitungan Anggaran Biaya Antara Sni 2008 dengan Permen PUPR 2022 Pada Proyek Rehabilitasi Ruang Kelas SMPN 3 Margasari. Repository Universitas Pancasakti Tegal.
Pratama, S. (2017). Analisis Perbandingan Koefisien Harga Satuan Pekerjaan Berdasarkan Kondisi Aktual, SNI, AHSP, dan Analisa K (Studi Kasus: Proyek Pembangunan Drainase Saluran Limbah Tpa Terjun Marelan Medan). Repositori Institusi Universitas Sumatera Utara.
Rosadi, M., Cahyadi, H., & Adawiyah, R. (2018). Perbandingan Perhitungan Anggaran Biaya Pemancangan Tiang Pancang Beton Antarasni 2008, Peraturan Menteri PUPR 2016 dan Biaya Nyata Dilapangan (Studi Pada Proyek Perkuatan Tebing Sungai Danpenataan Bantaran Sungai Martapura Kawasan Antasari Kota Banjarmasin. Repository Universitas Islam Kalimantan.
Siburian, D., Kritiana, W., & Happy P, V. (2022). Analisis Perbandingan Estimasi Biaya Menggunakan Metode SNI 2017 dan AHSP 2016 (Studi Kasus : Proyek Pembangunan Gedung Kuliah Terpadu Universitas Palangka Raya). Jurnal Ilmiah Teknik Sipil Transukma, 4(2), 138–143.
Rasuna, T. Y. (2019). Analisa Perbandingan Rencana Anggaran Biaya Pembangunan Mall Widuri Dengan Menggunakan Metode Bow, SNI 2008 dan AHSP 2016. UMSU Repository.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Marvin Patrick Patty, Pieter Lourens Frans, Willem Gaspersz
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this Journal agree to the following terms:
- Author retain copyright and grant the journal right of first publication with the work simultaneously licensed under a creative commons attribution licensethat allow others to share the work within an acknowledgement of the work’s authorship and initial publication of this journal.
- Authors are able to enter into separate, additional contractual arrangementfor the non-exclusive distribution of the journal’s published version of the work (e.g. acknowledgement of its initial publication in this journal).
- Authors are permitted and encouraged to post their work online(e.g. in institutional repositories or on their websites) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published works.