IMPACT OF LEAN CONSTRUCTION IMPLEMENTATION ON CONSTRUCTION BUILDING PROJECTS
DOI:
https://doi.org/10.21009/jpensil.v14i2.54389Kata Kunci:
lean construction, last planner system, percent planned completed, waste management, ProductivityAbstrak
Enhancing efficiency, minimizing waste, and improving project productivity are key objectives in Lean Construction. This study explores the impact of Lean Construction implementation at PT PP by examining the correlation between Planned Percentage Complete (PPC) in the Last Planner System (LPS) and project performance, including productivity and cost efficiency. The research employs a descriptive statistical analysis method, with data collected through a self-assessment survey and an evaluation of the correlation between PPC and key project management factors. The results indicate that LPS implementation significantly enhances productivity, with a positive correlation between PPC values and project efficiency. Furthermore, waste analysis reveals that Waiting, Defect, and Overproduction are construction projects' most dominant waste categories. This study also identifies that Lookahead Planning within LPS is crucial in reducing constraints, positively impacting project timeliness and cost control. Consequently, the findings provide deeper insights into Lean Construction implementation and offer strategic recommendations for companies to sustainably enhance efficiency and project performance.
Referensi
A C, V., Rajan, S., Sreenivasan, A., & Suresh, M. (2023). Lean Implementation in the Construction Industry. Proceedings of the International Conference on Industrial Engineering and Operations Management, 1073–1080. https://doi.org/10.46254/an13.20230308
Aisyah, R. A., Gunawan, K., & Gazali, A. (2023). Lean Construction Through Waste Register Method: A Case Studies Project in Indonesia. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 1303–1313. https://doi.org/10.24928/2023/0204
Amado, M. A. D. (2022). CHALLENGES AND IMPORTANCE OF HUMAN BEINGS WITHIN THE LAST PLANNER SYSTEM IN COLOMBIA: A CASE STUDY. 30th Annual Conference of the International Group for Lean Construction, IGLC 2022, 271–282. https://doi.org/10.24928/2022/0129
Amaral, T. G. do, Pessoni, R. C. de S., Filho, R. R. D. G., Galo, N. R., Luz, N. R. da, & Marcelino, G. (2024). Methodology to Avoid the Occurrence of Making-Do Waste in Civil Construction. Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32), 341–352. https://doi.org/10.24928/2024/0124
Antonini, B. G., Pimentel, F. M., Fireman, M. C. T., Etges, B. M. B. S., Campos, F. R., Junior, J. de L., & Kronbauer, B. K. (2023). Logistics Planning Within the Last Planner System for Highway Construction Projects. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 1291–1302. https://doi.org/10.24928/2023/0191
Asadian, E., & Leicht, R. M. (2022). SOCIAL INTERACTIONS AND TEAM DYNAMICS IN A LAST PLANNER MEETING: AN OBSERVATIONAL METHOD. 30th Annual Conference of the International Group for Lean Construction, IGLC 2022, 480–491. https://doi.org/10.24928/2022/0153
Assaf, S., Ezzedine, F., Nahle, A., Zahr, H., & Hamzeh, F. (2024). Evaluating the Awareness of Designing Out Waste in Construction: A Lean–Green Synergy. Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32), 1015–1026. https://doi.org/10.24928/2024/0192
Ayalew, T., Dakhli, Z., & Lafhaj, Z. (2018). Characterization of waste in Ethiopian building construction projects. IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers, 2, 797–806. https://doi.org/10.24928/2018/0505
Bajjou, M. S., & Chafi, A. (2018). The potential effectiveness of lean construction principles in reducing construction process waste: an input-output model. Journal of Mechanical Engineering and Sciences, 12(4), 4141–4160. https://doi.org/https://doi.org/10.15282/jmes.12.4.2018.12.0358
Bharadhwaaj, P. R. (2022). Productivity Analysis in Lean Construction. International Journal of Engineering Technology and Management Sciences, 6(4), 95–101. https://doi.org/10.46647/ijetms.2022.v06i04.0018
Binh, N. T. (2013). Applying lean construction to construction project. Advanced Materials Research, 834–836(December 2005), 1976–1983. https://doi.org/10.4028/www.scientific.net/AMR.834-836.1976
Brioso, X., Delgado, K., Herrera, R. F., Lozano, M., & Bravo, L. (2024). Collaborative Planning of Subcontractors Using the Last Planner System and BIM: A Case Study on a Gas Subcontractor in Repetitive Housing Projects. Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32), 523–534. https://doi.org/10.24928/2024/0222
Daniel, E. I., Christine, P., Dickens, G., & Marasini, R. (2018). Empirical study on the influence of procurement methods on last planner® system implementation. IGLC 2018 - Proceedings of the 26th Annual Conference of the International Group for Lean Construction: Evolving Lean Construction Towards Mature Production Management Across Cultures and Frontiers, 2, 681–690. https://doi.org/10.24928/2018/0398
Darmawan, R., & Susetyo, B. (2025). IMPROVING THE QUALITY OF WORK ON CULVERT UNDERPASS BOX STRUCTURES USING THE LEAN SIX SIGMA METHOD. Jurnal PenSil, 14(1), 1–19. https://doi.org/10.21009/jpensil.v14i1.45230
Elshaboury, N., Alaa, H., Al-Sakkaf, A., Alfalah, G., & Abdelkader, E. M. (2021). Prioritizing Delay Causes in the Egyptian Building Construction Projects. Proceedings of the 6th World Congress on Civil, Structural, and Environmental Engineering (CSEE’21), 1–9. https://doi.org/10.11159/icsect21.lx.103
Erazo-Rondinel, A. A., Vila-Comun, A., & Alva, A. (2020). Application of the Last Planner® System in a sports infrastructure project in Peru. IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020, 529–540. https://doi.org/10.24928/2020/0091
Fireman, M. C. T., Bizarro, L. B., Antonini, B. G., Campos, G. S. de, Junior, C. D., & Etges, B. M. B. S. (2024). Last Planner System in the Owner’s Perspective: Case Study in Onshore Wind Energy Projects. Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32), 466–467. https://doi.org/10.24928/2024/0210
Gao, S., Chan, T. K., & Hendy, P. (2023). Adoption of the digitalised last planner system in infrastructure projects: an Australian case study. Construction Innovation. https://doi.org/10.1108/CI-03-2023-0058
Garcés, G., & Peña, C. (2023). A Review on Lean Construction for Construction Project Management. Revista Ingenieria de Construccion, 38(1), 43–60. https://doi.org/10.7764/RIC.00051.21
García-Nieves, J. D., Ponz-Tienda, J. L., Salcedo-Bernal, A., & Pellicer, E. (2018). The Multimode Resource Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects. Computer-Aided Civil and Infrastructure Engineering, 33(8), 655–671. https://doi.org/10.1111/mice.12356
Gupta, A., & Devkar, G. (2023). Investigating Emergence of ‘New Tasks’ in Last Planner® System: Social Network Perspective of Planning Behaviours. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 1314–1325. https://doi.org/10.24928/2023/0208
Indrayani, H. (2012). PENERAPAN TEKNOLOGI INFORMASI DALAM PENINGKATAN EFEKTIVITAS, EFISIENSI DAN PRODUKTIVITAS PERUSAHAAN. Jurnal EL-RIYASAH, 3, 48–56. https://doi.org/10.24014/jel.v3i1.664
Ivina, D., & Olsson, N. O. E. (2020). Lean construction principles and railway maintenance planning. IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020, 565–576. https://doi.org/10.24928/2020/0025
Kalubovila, K. A. O. T., & Kawmudi, W. N. (2023). The Impact of Lean Construction Tools on the Reduction of Contractor-Related Causes of Delay in Sri Lankan Construction Industry. KDU Journal of Multidisciplinary Studies, 5(2), 84–92. https://doi.org/10.4038/kjms.v5i2.79
Kamal, M., Dokhan, S., & El-Dash, K. (2022). Assessing the Impact of Delay of Shop Drawing Process in Construction Projects. Engineering Research Journal -(ERJ), 51(4), 161–180. https://doi.org/10.21608/erjsh.2022.155645.1072
Kassab, O. A., Young, B. K., & Lædre, O. (2020). Implementation of Last Planner® System in an infrastructure project. IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020, 517–528. https://doi.org/10.24928/2020/0089
Kurniawan, H. A., Susilowati, F., & Jannah, R. M. (2024). STUDY ON IMPLEMENTATION OF CONSTRUCTION WASTE MANAGEMENT IN MINIMIZING CONSTRUCTION MATERIAL WASTE. Jurnal PenSil, 13(1), 1–12. https://doi.org/10.21009/jpensil.v13i1.37863
Lagos, C., Alarcón, L. F., Basoalto, F., & Del Río, Ó. (2020). Using reasons for non-compliance to assess project performance in the last planner system®. IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020, 241–252. https://doi.org/10.24928/2020/0090
Lagos, C. I., Herrera, R. F., Muñoz, J., & Alarcón, L. F. (2022). INFLUENCE OF LAST PLANNER® SYSTEM ADOPTION LEVEL ON PROJECT MANAGEMENT AND COMMUNICATION. 30th Annual Conference of the International Group for Lean Construction, IGLC 2022, 211–222. https://doi.org/10.24928/2022/0124
Lappalainen, E., Ibrahim, H. A., Seppänen, O., & Palsola, I. (2022). FINDINGS ON THE USE OF THE LAST PLANNER SYSTEM—A CASE STUDY. 30th Annual Conference of the International Group for Lean Construction, IGLC 2022, 60–71. https://doi.org/10.24928/2022/0106
Lappalainen, E., Reinbold, A., & Seppänen, O. (2023). Planned Percentage Completed in Construction – a Quantitative Review of Literature. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 1104–1115. https://doi.org/10.24928/2023/0104
Maradzano, I., Dondofema, R. A., & Matope, S. (2019). Application of lean principles in the south african construction industry. South African Journal of Industrial Engineering, 30(3), 210–223. https://doi.org/10.7166/30-3-2240
Mats, B. (1992). What is productivity? IFAC Proceedings Volumes, 25(8), 203–210. https://doi.org/10.1016/s1474-6670(17)54065-3
Pancholi, J., & Devkar, G. (2023). Analysing the Influence of Organizational Culture in Projects using Last Planner System. Construction Economics and Building, 23(3–4), 143–169. https://doi.org/10.5130/AJCEB.v23i3/4.8804
Pourrahimian, E., Shehab, L., & Hamzeh, F. (2023). Investigating and Simulating Collaboration Among the LPS Phases. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 929–941. https://doi.org/10.24928/2023/0174
Power, W., Sinnott, D., Lynch, P., & Solorz, C. (2023). An Evaluation of the Lookahead Planning Function in Last Planner® System. Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31), 1337–1349. https://doi.org/10.24928/2023/0217
Power, W., Sinnott, D., & Mullin, A. (2021). Improving Commissioning and Qualification Delivery Using Last Planner System®. Lean Construction Journal, 2021, 36–52. https://doi.org/10.24928/2020/0016
Sacks, R., Seppänen, O., Priven, V., & Savosnick, J. (2017). Construction flow index: a metric of production flow quality in construction. Construction Management and Economics, 35(1–2), 45–63. https://doi.org/10.1080/01446193.2016.1274417
Samad, G. El, Hamzeh, F. R., & Emdanat, S. (2017). Last Planner System - The need for new metrics. IGLC 2017 - Proceedings of the 25th Annual Conference of the International Group for Lean Construction, II(July), 637–644. https://doi.org/10.24928/2017/0218
Sharma, A., & Trivedi, J. (2021). APPLICATION OF INFORMATION THEORY IN LAST PLANNER® SYSTEM FOR WORK PLAN RELIABILITY. IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges, 727–736. https://doi.org/10.24928/2021/0147
Torre, J. R. D. La, Taboada, L. J., & Picoy, P. E. (2021). Road Construction Labor Performance Control Using Ppc, Pcr and Rnc During the Pandemic. IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges, 747–756. https://doi.org/10.24928/2021/0166
Witte, C. S., Kokkula, S., & Muller, G. (2022). Visual Lean planning tools in the construction industry: A Norwegian case study. INCOSE International Symposium, 32(1), 75–91. https://doi.org/10.1002/iis2.12918
Zelenko, D., & Maxwell, D. (2024). Lean Construction for Innovation: A Systematic Review of IGLC Proceedings. Proceedings of the 32nd Annual Conference of the International Group for Lean Construction (IGLC 32), 1– (Fireman et al., 2024) https://doi.org/10.24928/2024/0111
Zighan, S., & Abualqumboz, M. (2021). A Project Life-Cycle Readiness Approach to Manage Construction Waste in Jordan. Construction Economics and Building, 21(3), 58–79. https://doi.org/10.5130/AJCEB.V21I3.7628
Unduhan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
Hak Cipta (c) 2025 Abdhy Gazali, Aldy Riza Dhiandra, Muhammad Sapto Nugroho, Alfandi Ziqri, Lintang Tirta Sari

Artikel ini berlisensiCreative Commons Attribution-ShareAlike 4.0 International License.








.png)
.png)
1.png)