ANALYSIS OF THE EFFECT OF CONTRACT CHANGE ORDER FACTORS ON THE PERFORMANCE OF ROAD FACILITY PROJECTS
DOI:
https://doi.org/10.21009/jpensil.v13i2.44011Keywords:
CCO, Cost Performance and Time Performance, SEM PLS, Road FacilitiesAbstract
Road facilities are part of the national transportation system according to Article 25 in Law of the Republic of Indonesia Number 22 of 2009 concerning Road Traffic and Transportation. Road facilities in the form of sidewalks and crossings are crossings for pedestrians. The arrangement of sidewalks by the DKI Jakarta Provincial Government is to improve urban infrastructure, where the percentage of sidewalk arrangements by 2022 will reach 5.58% of the length of roads in Jakarta. This research aims to determine the influence of factors Contract Change Order (CCO) on cost performance and implementation time for sidewalk arrangement activities, using structural equation modeling techniques-partial least squares (SEM-PLS). This research focuses on identifying the main CCO factors that directly influence cost performance, and indirectly influence implementation time performance through cost performance on road facility projects. There are 3 (three) types of research variables used; The independent variables consist of scope of work, planning, policy changes, specification changes, and coordination of related parties, the dependent variable is cost performance and the intervening variable is cost performance as a mediating variable of the influence of the CCO factor on time performance. The results showed that the coordination of related parties had a direct and significant positive impact on cost performance by 59%, and an indirect and significant impact on time performance through cost performance as a mediating variable by 37.7%.
References
Ahmad, B., & Laha, M. S. (2020). Penerapan studi lapangan dalam meningkatkan kemampuan analisis masalah (Studi Kasus pada mahasiswa Sosiologi IISIP YAPIS BIAK). Jurnal Nalar Pendidikan, 8(1), 63.
Arnandha, Y., Nisworo, S., & Djaeni, M. (2023). Analisis Pengaruh Contract Change Order (CCO) pada Siklus Keberlangsungan Proyek. Jurnal Profesi Insinyur Indonesia, 1(4), 112–118. https://doi.org/10.14710/jpii.2023.17479
Aziza, N. (2023). Metodologi penelitian 1 : deskriptif kuantitatif. ResearchGate, July, 166–178.
BPS. (2022). Panjang dan Luas Trotoar di Provinsi DKI Jakarta, 2001-2020. https://jakarta.bps.go.id/statictable/2015/03/31/33/panjang-dan-luas-trotoar-di-provinsi-dki-jakarta-2001-2020.html
Brahmantariguna, I. A. A., Dharmayanti, G. C., & Yansen, I. W. (2016). Hubungan Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Gedung. Jurnal Spektran, 4(2), 55–62. https://doi.org/10.24843/spektran.2016.v04.i02.p07
Dosumu, O. S., & Aigbavboa, C. O. (2017). Impact of Design Errors on Variation Cost of Selected Building Project in Nigeria. Procedia Engineering, 196(June), 847–856. https://doi.org/10.1016/j.proeng.2017.08.016
Fardila, D., & Adawyah, N. R. (2021). Optimasi Biaya dan Waktu Proyek Konstruksi dengan Lembur dan Penambahan Tenaga Kerja. INERSIA: LNformasi Dan Ekspose Hasil Riset Teknik SIpil Dan Arsitektur, 17(1), 35–46. https://doi.org/10.21831/inersia.v17i1.39499
Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4). https://doi.org/10.1016/j.heliyon.2021.e06826
Geraldo, M., & Ariesto, F. (2022). Faktor Penyebab Dan Dampak Change Order Terhadap Indikator Performa Proyek. Jurnal Ilmiah Teknik Sipil a Scientific Journal of Civil Engineering, 11(2), 130–137.
Hamid, R. S., & Anwar, S. M. (2019). Structural Equation Modelling (SEM) Berbasis Varian: Konsep Dasar dan Aplikasi Program Smart PLS 3.2.8 dalam Riset Bisnis (Abiratno, S. Nurdiyanti, & A. D. Raksanagara (eds.); Cetakan 1). PT Inkubator Penulis Indonesia.
Hansen, S., & Nindartin, A. (2022). Profiling Contract Change Order Disputes: An Empirical Validation Study. International Journal of Construction Supply Chain Management, 12(2), 16–31. https://doi.org/10.14424/ijcscm120222-16-31
Immanuel, R., & Yuwono, B. E. (2020). Kematangan Shop Drawing Sebagai Penentu Pekerjaan Ulang (Rework) Proyek Konstruksi. Indonesian Journal of Construction Engineering and Sustainable Development (Cesd), 3(1), 42–48. https://doi.org/10.25105/cesd.v3i1.8023
Isfandina. (2022). Analisis aspek variation order terhadap kinerja proyek konstruksi berbasis earned value dan sem-pls pada proyek infrastruktur transportasi. Mercu Buana Jakarta.
Iskandar, Y., Susetyo, B., & Suroso, A. (2022). Pengaruh Contract Change Order (CCO) terhadap Kinerja Biaya pada Proyek Hunian Bertingkat Tinggi. Jurnal Konstruksia |, 13(2), 55–64.
Junius, A., & Waty, M. (2020). Dampak Change Order Pada Proyek Perkerasan Jalan. JMTS: Jurnal Mitra Teknik Sipil, 3(1), 199. https://doi.org/10.24912/jmts.v3i1.7023
Kamaludin, T. M., Rusdin, A., & Nirmalawati. (2023). Study of Contract Change Order (Cco) on Implementation Time in Building Construction Project. Journal of Applied Engineering and Technological Science, 4(2), 722–733. https://doi.org/10.37385/jaets.v4i2.1664
Kanniappan, P. (2022). Causes & effects of Project Change order Instructor : Prof . Aaron Cohen Submitted By : Panneerselvam Kanniappan. January.
Khalim Abdul. (2021). Analisis Contract Change Order pada Pelaksanaan Proyek Konstruksi. Tesis.
Kuswandari, E. (2019). Pengaruh Dampak Contract Change Order Terhadap Kinerja Kontraktor Proyek Studi Kasus: Rehabilitasi Jembatan Ngablak. Jurnal Teknik Sipil, 14(4), 255–282. https://doi.org/10.24002/jts.v14i4.2001
Latumeten, R., Lesnussa, Y. A., & Rumlawang, F. Y. (2018). Penggunaan Structural Equation Modeling (Sem) untuk Menganalisis Faktor yang Mempengaruhi Loyalitas Nasabah (Studi Kasus : PT Bank Negara Indonesia (BNI) KCU Ambon). Sainmatika: Jurnal Ilmiah Matematika Dan Ilmu Pengetahuan Alam, 15(2), 76. https://doi.org/10.31851/sainmatika.v15i2.2301
Mishra, A. K., & Aithal, P. S. (2022). Causes and Effects of Design Change of Construction Projects. International Journal of Applied Engineering and Management Letters, February, 87–99. https://doi.org/10.47992/ijaeml.2581.7000.0122
Mohammad, N., Che-Ani, A. I., & Rakmat, R. A. O. K. (2017). Causes and effects of variation orders in the construction of terrace housing projects: A case study in the State of Selangor, Malaysia. International Journal of Supply Chain Management, 6(1), 226–232.
Nurmala, A., & Hardjomuljadi, S. (2015). Penyebab Dan Dampak Variation Order ( VO ) Pada Pelaksanaan Proyek Konstruksi. Jurnal Konstruksia, Volume 6 N(2), 63–77. https://doi.org/https://doi.org/10.24853/jk.6.2.%25p
Perwitasari, D., Rahadianto, D., & Parapat, N. (2019). Identifikasi Dampak Contract Change Order Terhadap Biaya Dan Kualitas Pada Proyek Gedung Laboratorium Teknik 2 Institut Teknologi Sumatera. Repo.Itera.Ac.Id.
Pinori, M., Sompie, B. ., & Willar, D. (2015). Analisis Faktor Keterlambatan Penyelesaian Proyek Konstruksi Gedung Terhadap Mutu , Biaya. Jurnal Ilmiah Media Engineering, 5(2), 401–405.
Prianto, K., Dewi, S. M., & Pujiraharjo, A. (2014). Pengaruh Kompetensi Manajer Proyek Terhadap Keberhasilan Proyek Pada Perusahaan Kontraktor Di Kabupaten Malang. Jurnal Media Teknik Sipil, 10(2), 156–168. https://doi.org/10.22219/jmts.v10i2.1790
Puspitasari, W. D., & Febrinita, F. (2021). Pengujian Validasi Isi (Content Validity) Angket Persepsi Mahasiswa terhadap Pembelajaran Daring Matakuliah Matematika Komputasi. Journal Focus Action of Research Mathematic (Factor M), 4(1), 77–90. https://doi.org/10.30762/factor_m.v4i1.3254
Putri, I. R. H., & Waty, M. (2021). Penyebab Change Order Pada Proyek Konstruksi Bangunan Air Wilayah Dki Jakarta. JMTS: Jurnal Mitra Teknik Sipil, 4(1), 249. https://doi.org/10.24912/jmts.v0i0.10289
Rahadi, D. R. (2023). Pengantar Partial Least Squares Structural Equation Model (PLS-SEM) 2023. CV. Lentera Ilmu Madani, Juli, 146.
Rahadi, D. R., & Farid, M. (2021). Analisis Variabel Moderating. In CV. Lentera Ilmu Mandiri (Vol. 7, Issue 2).
Rahmad Salling Hamid, S.E, M. . (2019). Struktural equation modeling (SEM) berbasis varian.
Shrestha, P. P., & Maharjan, R. (2018). Effects of Change Orders on Cost Growth, Schedule Growth, and Construction Intensity of Large Highway Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10(3), 1–9. https://doi.org/10.1061/(asce)la.1943-4170.0000264
Supriyanto. (2019). Analisis Kebutuhan Fasilitas Pelengkap Jalan Bagi Pejalan Kaki Di Jalan Jaksa Agung Suprapto. JuRnal PerADaban SaIns, RekayAsa Dan TeknoLogi Sekolah Tinggi Teknik (STITEK) Bina Taruna Gorontalo, 1(11150331000034), 1–147.
Susanti, R. (2020). Cost overrun and time delay of construction project in Indonesia. Journal of Physics: Conference Series, 1444(1), 0–8. https://doi.org/10.1088/1742-6596/1444/1/012050
Susila, H. (2019). Pengaruh Perubahan Kontrak Terhadap Pelaksanaan Proyek Konstruksi. 24(2), 17–23.
Tenno, Z., & Suroso, A. (2021). Analisis Faktor Penyebab CCO dan Pengaruhnya Terhadap Biaya Kontraktor Pada Proyek Jalan Tol. Jurnal Aplikasi Teknik Sipil, 19(3), 335. https://doi.org/10.12962/j2579-891x.v19i3.9537
Wardhana, A. (2022). Penelitian Survei, Proses Penelitian, Masalah Dan Hubungan Antar Variabel Kuantitatif. Metodologi Penelitian Kuantitatif, Kualitatif Dan Kombinasi, April, 17–25.
Wibowo, W. P., Witjaksana, B., & TJendani, H. T. (2023). Analysis of Contract Change Order (Cco) Costs in Building Construction Projects. Asian Journal of Engineering, Social and Health, 2(12), 1719–1732. https://doi.org/10.46799/ajesh.v2i12.211
Widhiawati Ida Ayu Rai, Anak Agung Wiranata, I. P. Y. W. (2016). Faktor-Faktor Penyebab Change Order Pada Proyek Konstruksi Gedung. Jurnal Ilmiah Teknik Sipil a Scientific Journal of Civil Engineering, 1–7.
Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2014). Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung. Teknik Sipil Universitas Agung Tirtayasa, Vol. 6(1), 15–29.
Yuni, N. K. S. E., Norken, I. N., Sudarsana, D. K., & Adnyana, I. B. P. (2017). Risk Analysis of Tender Documents on the Execution of Private Construction Work at Badung Regency, Bali Province, Indonesia. Journal of Sustainable Development, 10(4), 130. https://doi.org/10.5539/jsd.v10n4p130