ANALYSIS OF 5R/S WORK CULTURE IN THE BOWPLANK INSTALLATION PRACTICE IN CONSTRUCTION ENGINEERING
DOI:
https://doi.org/10.21009/jpensil.v15i3.67380Keywords:
Work Culture, 5R/S, Bowplank, Construction Practices, Construction EngineeringAbstract
The installation of bowplanks as part of the assignment work still shows variations due to the less than optimal implementation of the 5R/S work culture in the field, especially in the arrangement of measuring tools, neatness of the work area, and compliance with K3 procedures. This study aims to analyze the implementation of the 5R/S work culture in the installation of bowplanks in the field of construction engineering carried out by students of the Vocational School of Construction and Housing Engineering SMKN 3 Semarang. The method used is quantitative with a correlational approach. The sampling technique used is total sampling with 72 respondents from 2 classes. Data were analyzed using descriptive statistical tests, normality tests, linearity tests, and correlation tests using SPSS statistical software. The results show that the level of implementation of the 5R/S work culture is in a fairly consistent category with an average value of 73.15, while the average level of understanding is 73.76 with relatively high variations. The correlation test produces a significance value of 0.000 which indicates a significant relationship between the understanding of the 5R/S work culture and its implementation in the installation of bowplanks. These findings indicate that consistent application of 5R/S can contribute to improving the quality of work, especially in determining the axes and elevations of buildings.
References
Ahmad, M., & Susilawati. (2023). Penerapan Budaya Keselamatan dan Kesehatan Kerja (K3) di Laboratorium Pendidikan Kimia Madrasah Aliyah Negeri (MAN) Pematang Siantar. Jurnal Ilmu Komputer, Ekonomi, Dan Manajemen (JIKEM), 3(2), 2734–2741.
Al Hassany, I. R., & Nurdin, A. (2024). Pengenalan Program Keselamatan dan Kesehatan Kerja Melalui Penerapan 5S pada Siswa SMK Leonardo Klaten. Perwira: Journal of Community Development, 4(1), 18–22. https://doi.org/10.54199/pjcd.v4i1.268
Amir, A., Ashad, H., & Watono. (2024). Evaluasi Metode Kerja Terhadap Waktu pada Pelaksanaan Konstruksi Jalan. Journal Flyover (JFO), 4(2), 343–350. https://doi.org/10.52103/jfo.v4i2.2202
Ananta, D., Hassanah, A. H., Algeri, D. F., & Sulastri. (2025). Implementasi Keselamatan Kerja dan Housekeeping 5R pada Proyek Pembangunan Gedung II Hospitality Training Center di Universitas Negeri Padang. Jurnal Ilmu Pendidikan - Manajemen (JIP-M), 1(4), 251–261.
Anwar, H., & Junaidin. (2026). Efektivitas Standar Operasional Prosedur Laboratorium dalam Pembiasaan Perilaku Positif Siswa Sekolah Dasar. Jurnal Pendidikan, Sains, Geologi, Dan Geofisika (GeoScienceEd Journal), 7(3), 2642–2647. https://doi.org/10.29303/goescienceed.v7i3.2126
Aprilianda, A., Lubis, M. Z., Permana, A., Pamungkas, S. D., & Adam, M. (2020). Survei Penentuan dan Pengontrolan Batas Zona Penyusun Main Dam pada Proyek Bendungan Ladongi Provinsi Sulawesi Tenggara. JGISE: Journal of Geospatial Information Science and Engineering, 3(2), 95–105. https://doi.org/10.22146/jgise.58743
Aqyar, A. M., & Kirono, I. (2023). Evaluasi Penerapan Metode 5R+S (Ringkas,Rapi,Resik,Rawat,Rajin + Safety) pada Ruang Produksi untuk Meningkatkan Produktivitas di CV. Unicorn Kencana Indopetra. Jurnal Ilmiah Akmen, 20(3), 272–282. https://doi.org/10.37476/akmen.v20i3.4370
Aziz, W. D. I., Prawira, A. S., & Umam, K. (2026). Budaya Kerja dan Implikasinya terhadap Pola Interaksi Serta Etos Kerja Pegawai. Jurnal Agama Dan Sosial Humaniora (JASH), 3(1), 12–21. https://doi.org/10.15575/jash.v3i1.3169
Dilaksa, A. F., Mufidah, I. U., & Rojak, O. Bin. (2025). Analisis Implementasi Pelaksanaan Program Ringkas, Rapi, Resik, Rawat, Rajin (5R) di PT X Proyek pada Proyek X. An-Najat:Jurnal Ilmu Farmasi, 3(3), 309–318. https://doi.org/10.59841/an-najat.v3i3.3301
Fadillah, D. M. (2025). Teknik Setting Out Pekerjaan Konstruksi di Atas Lahan Tanah dengan Kemiringan 30% pada Perancangan Bangunan Rumah Hunian. Jurnal Eduscotech, 6(1), 1–16.
Fuad, M. N., Kusumawardani, R., & Supraptono, E. (2025). Optimizing Student’s Understanding Through The Use of OSH Land Measurement Guidelines in Vocational High School. Jurnal Pensil, 14(2), 282–292. https://doi.org/10.21009/jpensil.v14i2.53523
Gumilar, R., & Hendrayana, Y. (2024). Pelaksanaan Pekerjaan Struktur Bawah Bangunan Gedung Serbaguna Gelanggang Generasi Muda MajalengkaPelaksanaan Pekerjaan Struktur Bawah Bangunan Gedung Serbaguna Gelanggang Generasi Muda Majalengka. Seminar Teknologi Majalengka (STIMA), 8, 266–270. https://doi.org/10.31949/stima.v8i0.1158
Hutasuhut, R., Putra, O. A., & Fauzan, S. A. (2025). Metode Pelaksanaan Pekerjaan Raft-Pile Foundation pada Proyek Bangunan Gedung di Kawasan PIK 2. Menara: Jurnal Teknik Sipil, 20(2), 76–85. https://doi.org/10.21009/jmenara.v20i2.54329
Karuppuswamy, Aravinth, Ray, A., Ramanathan, & Prabakaran. (2026). Evaluating 5S implementation and challenges in garment manufacturing units: a study in Tiruppur district. Research Journal of Textile and Apparel, 1–19. https://doi.org/10.1108/RJTA-05-2025-0098
Kassofi, M. F. I., & Yusuf, M. (2026). Penerapan Metode Kerja Pondasi Footplat pada Proyek Gedung Bertingkat Rendah. FTIK: Open Journal Sistem, 1(1), 8–15.
Kularathne, N., Manjaree, S., & Langseth, M. (2026). Perceptions and Challenges of 5S Implementation in Higher Education: A Case Study from Sri Lanka. Procedia Computer Science, 278, 282–291. https://doi.org/10.1016/j.procs.2026.02.464
Mahasin, A., & Suyitno, S. (2022). Pengaruh Budaya Industri 5R/S Terhadap Peningkatan Efektivitas Praktik Siswa Kelas XII Ototronik 4, di Laboratorium SMK Taman Karya Madya Pertambangan Kebumen. Auto Tech: Jurnal Pendidikan Teknik Otomotif Universitas Muhammadiyah Purworejo, 17(1), 29–37. https://doi.org/10.37729/autotech.v17i1.1780
Mahyar, H., Syahyadi, R., Miswar, K., & Fauzi, A. (2019). Pelatihan Pemasangan Bowplank Dan Penentuan Titik Pondasi Tiang Pancang Bangunan Bertingkat Bagi Masyarakat Desa Mesjid Punteuet Kecamatan Blang Mangat Kota Lhokseumawe. Proceeding Seminar Nasional Politeknik Negeri Lhokseumawe, 39–41.
Mahyudin, Z. S., & hermawan, A. (2025). Analisis Implementasi K3 pada Proyek Konstruksi PT R. Journal of Environmental and Safety Engineering, 4(1), 1–6. https://doi.org/10.63916/jese.v4i1.342
Mauludi, A. A., Dewi, R. P., Karim, M. A., Arini, T., Anggraini, D., Nurhidayanti, T., & Sulfiantono, A. (2026). Faktor Manusia dalam Keselamatan dan Kesehatan Kerja di Wisata Petualangan: Studi Eksploratif. Nusantara Sehat: Jurnal Kesehatan Indonesia, 1(5), 187–198. https://doi.org/10.65307/ns.v1i5.173
Mu’arif, Yuliani, Z., & Azahra, S. (2026). Strategi Adaptif Manajemen Sumber Daya Manusia Menghadapi Keterbatasan Tenaga Kerja pada Perusahaan . Jurnal Pengabdian Kepada Masyarakat Nusantara, 7(1), 1877–1888. https://doi.org/10.55338/jpkmn.v7i1.8646
Mulyani, E. S. (2024). Hubungan Budaya Kerja dan Kualitas Pembelajaran di SMK. JTPPm: Jurnal Teknologi Pendidikan Dan Pembelajaran, 11(2), 58–70. https://doi.org/10.62870/jtppm.v12i1.34470
Mulyo, Y. S., Puro, S., & Fahruroji, A. F. (2020). Evaluasi Sistem Manajemen Risiko Keselamatan Kerja pada Pekerjaan Struktur Atas Di Proyek Pembangunan LRT Cawang– Dukuh Atas. Jurnal Media Teknik Sipil, 18(1), 43–55. https://doi.org/10.22219/jmts.v18i1.10719
Muotka, S., Togiani, A., & Varis, J. (2023). A Design Thinking Approach: Applying 5S Methodology Effectively in an Industrial Work Environment. Procedia CIRP, 119, 363–370. https://doi.org/10.1016/j.procir.2023.03.103
Plevris, V., & Papazafeiropoulos, G. (2024). AI in Structural Health Monitoring for Infrastructure Maintenance and Safety. Infrastructures, 9(12), 225. https://doi.org/10.3390/infrastructures9120225
Riawan, M. H., & Hadidjija, K. (2023). Penerapan 5R di Lingkungan Kerja Fakultas Teknologi dan Sains dalam Rangka Peningkatan Etos Kerja. Jurnal Pengabdian Harapan Bangsa, 1(3), 129–136. https://doi.org/10.56854/jphb.v1i3.115
Samoling, I. K., Saputra, F., & Triyono, A. (2023). Hubungan Pengawasan, Sikap, dan Prasarana dengan Perilaku 5R (Ringkas, Rapi, Resik, Rawat, dan Rajin). Journal of Public Health Education, 3(1), 418–424. https://doi.org/10.53801/jphe.v3i1.163
Sanjaya, G., Abadi, Z., & Efendi, F. (2024). Pengaruh Budaya Kerja 5R (Rapi, Ringkas, Resik, Rajin, Rawat) Terhadap Softskill Siswa SMK Negeri 2 Tembilahan. Jurnal Vokasi Mekanika (Vomek), 6(3), 329–333. https://doi.org/https://doi.org/10.24036/vomek.v6i3.735
Santosa, W. P., Sari, D. E., & Ahmad, N. L. (2022). Work Culture Implementation in Vocational High School. Proceedings International Conference on Education Innovation and Social Science, 29–33.
Sari, C. Y., Parisma, W. I., & Oktarizal, H. (2024). Analisis Penerapan 5R dan Safety pada Area Produksi dengan Metode Fish Bone Analysis di PT X Kota Batam. Al-Tamimi Kesmas: Jurnal Ilmu Kesehatan Masyarakat, 13(1), 48–62. https://doi.org/10.35328/kesmas.v13i1.2679
Septiari, A. N. H., Iriani, T., & Daryati. (2023). Implementation of the Blended Learning Model in Soil Mechanics Practice Courses in Building Engineering Education Study Program State University of Jakarta. Jurnal Pensil, 12(1), 56–64. https://doi.org/10.21009/jpensil.v12i1.29464
Setiyawan, A., Abdillah, F., & Mangiri, H. S. (2023). Pengaruh Budaya Kerja 5R dan Kompetensi (Pedagogik) Guru Produktif Terhadap Kompetensi Siswa pada Keselamatan dan Kesehatan Kerja (K3). Journal of Vocational Education and Automotive Technology, 5(1), 48. https://doi.org/10.31331/joveat.v5i1.2610
Shahriar, M. M., Parvez, M. S., Islam, M. A., & Talapatra, S. (2022). Implementation of 5S in a plastic bag manufacturing industry: A case study. Cleaner Engineering and Technology, 8, 100488. https://doi.org/10.1016/j.clet.2022.100488
Sobari, M., Wahyudin, D., & Dewi, L. (2023). Keterlibatan Industri dalam Pengembangan Kurikulum pada Tingkat SMK. Journal Education and Development, 11(3), 230–238. https://doi.org/10.37081/ed.v11i3.4771
Sugiyono. (2023). Metode Penelitian Kuantitatif, Kualitatif dan R&D. CV. ALFABETA.
Suprayitno, H., Rahadi, D. R., & Rusdianto, R. (2021). Mencegah Kecelakaan Kerja dengan Budaya 5R. Jurnal Pengabdian Kepada Masyarakat Bina Darma, 1(1), 20–29. https://doi.org/10.33557/pengabdian.v1i1.1342
Sutariyono. (2023). Penerapan Budaya 5R (Ringkas, Rapi, Resik, Rawat, Rajin) dalam Meningkatkan Produktivitas Karyawan Produksi Pabrik 1 Fitting PT. XYZ. Jurnal Manajemen Dan Kewirausahaan, 4(2), 105–116. https://doi.org/10.53682/mk.v4i2.7666
Sutianah, C. (2021). Peningkatan Kompetensi Kerja Berbasis Integrasi Soft Skills, Hard Skills dan Entrepreneur Skills Program Keahlian Kuliner Melalui Penerapan Teaching Factory SMK. Jurnal Ekonomi, Sosial, & Humaniora (Intelektiva), 2(8), 152–167.
Tjendani, H. T., & Ramadhan, K. (2022). Critical Path Method pada Proyek Myze Hotel Sumenep untuk Mengendalikan Biaya dan Waktu. Jurnal Kacapuri: Jurnal Keilmuan Teknik Sipil, 5(1), 240. https://doi.org/10.31602/jk.v5i1.7524
Waluyo, P. (2021). Analisis Penerapan Program K3/5R di PT X dengan Pendekatan Standar OHSAS 18001 dan Kemungkinan Penerapan pada Pengerjaan Proyek Konstruksi Selama Virus Corona Mewabah. Jurnal Konstruksia, 12(1), 69. https://doi.org/10.24853/jk.12.1.69-80
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Aulia Putri, Nurul Yuhanafia, Muhammad Nur Fuad

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.







.png)
.png)
1.png)
