Assessment of Conveyor Machine Maintenance Performance in the Filling Area Using MTTR, MTBF, and Availability Analysis
DOI:
https://doi.org/10.21009/JKEM.11.2.9Keywords:
asset readiness, breakdown frequency, bottleneck prevention, CMMS, operational reliabilityAbstract
Efficient machinery maintenance is paramount to ensuring continuous production flows and minimizing unexpected asset disruptions in automated manufacturing environments. This study evaluates the operational reliability and maintenance performance of a critical belt-type conveyor machine within the Lithos filling line at PT. Pertamina Lubricants. Utilizing historical breakdown data extracted from the facility's Computerized Maintenance Management System (CMMS), empirical time-centric metrics were calculated across a representative 18-day continuous production period. Within this temporal window, a total of 60 unscheduled mechanical and electrical failure sequences were documented and analysed. Quantitative processing reveals that the conveyor system exhibited an empirical Mean Time to Repair (MTTR) of 26.28 minutes and a Mean Time Between Failures (MTBF) of 225.72 minutes. These structural parameters yield a cumulative operational availability rate of 89.57%. Although the availability index indicates a reasonable baseline of functional readiness, the high breakdown frequency highlights critical system vulnerabilities that cause downstream bottlenecks and degrade overall plant efficiency. To optimize asset lifecycle performance and mitigate micro-stoppages, implementing a structured Cleaning, Lubrication, and Inspection (CLI) schedule within an autonomous maintenance framework is highly recommended. Empowering shop-floor operators to execute initial inspections will systematically enhance conveyor availability and production throughput.
References
[1] T. Wireman, "Developing performance indicators for managing maintenance," 4th ed., New York, USA: Industrial Press Inc., 2021.
[2] R. Smith and R. K. Mobley, "Rules of thumb for maintenance and reliability engineers," 3rd ed., Oxford, UK: Elsevier Butterworth-Heinemann, 2022.
[3] J. Cooper and D. Ward, “Predictive maintenance strategies and reliability indicators: A Review,” J. Qual. Maint. Eng., vol. 27, no. 3, pp. 110–125, 2021.
[4] A. Medikano, Anissa Aprilya, and N. A. Azisah, “Design innovation of wrench using catia v5r20 with anthropometric approach (case study on PT. karya bahana unigam machinery maintenance division),” Jurnal Konversi Energi dan Manufaktur, vol. 9, no. 1, pp. 20–31, 2023, doi: 10.21009/jkem.9.1.3.
[5] W. Novarika, M. Arfah, and R. A. Khoir, “Analysis of preventive maintenance on forklifts and reach trucks by calculating mean time between failure and mean time to repair at PT. DSV solutions indonesia,” in Proceeding International Conference Science Technology UISU (ICTS), pp. 143–149, 2024, doi: 10.30743/icst.
[6] B. Nugroho, “The impact of machine downtime on production targets in manufacturing companies,” J. Ind. Syst. Eng., vol. 9, no. 3, pp. 175–182, 2020.
[7] Y. H. Haerudin and W. D. Wibowo, “Analisis preventive maintenance mesin compressor dengan mean time between failure dan mean time to repair di PT. suzuki indomobil motor,” Journal of Management & Industrial Engineering, vol. 3, no. 2, pp. 73–81, 2024.
[8] A. S. Purba, N. F. P. Leksonowati, N. Pamungkas, N. Yuniarsih, N. H. Batubara, and D. Prasetyo, “Studi pengaruh nilai availability mesin stamping terhadap jumlah hasil produksi,” Jurnal Integrasi, vol. 16, no. 2, pp. 98–103, 2024.
[9] N. Thomas, “Total productive maintenance (TPM): a framework for continuous improvement,” oper. excell. J., vol. 8, no. 1, pp. 5–18, 2020.
[10] F. Oliveira and J. Silva, “A practical guide to MTBF, MTTR, and availability in small and medium enterprises,” J. Ind. Maint., vol. 10, no. 4, pp. 55–64, 2022.
[11] R. Ibrahim, "Maintenance management: metrics and key performance indicators," Academic Press Industrial Series, 2022.
[12] R. Pratama and T. Hidayat, “Application of descriptive analysis for conveyor machine component failure data,” Sci. J. Eng., vol. 3, no. 1, pp. 19–27, 2025.
[13] M. Qosim, "Machine maintenance management: theory and application in indonesian industries," Andi Publisher, 2021.
[14] Z. Hasan and K. Wijaya, “Evaluating machine repair time efficiency using qualitative and quantitative approaches,” J. Manuf. Manag., vol. 4, no. 3, pp. 142–150, 2021.
[15] S. Ahmad and A. Harris, “Analysis of machine reliability using MTBF and MTTR methods in manufacturing industry,” Int. J. Prod. Res., vol. 12, no. 2, pp. 45–52, 2020.
[16] A. Fadli and I. Gunawan, “Lathe machine reliability analysis using MTBF and MTTR indicators,” J. Mech. Eng., vol. 11, no. 2, pp. 88–95, 2023.
[17] D. Kurniawan and A. Setiawan, “Comparative analysis of RCM and MTBF methods in determining compressor maintenance schedules,” J. Ind. Technol., vol. 18, no. 1, pp. 34–41, 2024.
[18] E. Saputra and B. Utomo, “A case study on the efficiency of using microsoft excel in processing factory downtime data,” J. Ind. Comput., vol. 6, no. 2, pp. 73–81, 2022.
[19] M. Lewis, "Statistical methods in maintenance and reliability engineering," Reliability Press, 2021.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Lucky Arvel, Alsen Medikano, Budi Hermana

This work is licensed under a Creative Commons Attribution 4.0 International License.




















